Posted by: Pdfprep
Post Date: January 19, 2021
A backup job has been configured to keep three incremental restore points and a synthetic full backup each Sunday. More restore points are present on disk than what was configured in the job.
Why?
A . The old restore points will be deleted after the new restore chain meets the retention policy
B . Per VM backup files are enabled in the repository
C . The other restore points are weekly full backups, this is expected
D . You should configure the synthetic full backup to be performed on Mondays instead
Answer: C
Explanation:
Reference: https://www.veeam.com/kb1990
Leave a Reply