Posted by: Pdfprep
Post Date: November 16, 2020
Which two options correct when using VSS to combine two physical switches into one logical switch? (Choose two)
A . Both data planes forward traffic simultaneously.
B . Only one data plane forwards traffic, while the other data plane is on standby.
C . Both control planes forward traffic simultaneously.
D . Control planes are combined into one virtual control plane.
Answer: AD
Leave a Reply