You are a Dynamics 365 for Finance and Operations system administrator.
You use Lifecycle Services (LCS) for your deployment. The company currently has multiple methodologies assigned to various projects. One methodology is incorrectly assigned and must be changed.
You need to change the methodology on an existing project.
Which two options can you use? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.
A . Change methodology
B . Project settings
C . Manage methodologies
D . Edit methodology
Answer: A,C