Posted by: Pdfprep
Post Date: November 10, 2020
You have a Cisco UCS B-Series Blade Server chassis connected, which has four 10-Gbps connections to Cisco UCS Fabric Interconnect A. You plan to deploy a blade that has ESXi installed. You must provide a dedicated 10-Gbps uplink to the blade.
Which two actions should you perform? (Choose two.)
A. Configure a port channel between the Fabric Interconnect and the IOM.
B. Implement a QoS policy that has a policy bandwidth and assign the policy to a server profile.
C. Configure static pining to the uplink port in the server profile.
D. Configure dynamic pinning to the uplink port in the server profile.
E. Configure a vPC between the Fabric Interconnect and the IOM.
Answer: AB
Leave a Reply