For the DEV project, Max has these requirements relating to time logging:
– I need to be able to edit time logs.
– I need to be able to delete time logs.
Which three project permissions does Max need in order to meet these requirements? (Choose three.)
A . Schedule Issues
B . Edit All Worklogs
C . Move Issues
D . Delete All Worklogs
E . Work On Issues
F . Edit All Comments
Answer: BDE
Explanation:
Reference: https://confluence.atlassian.com/jirasoftwarecloud/logging-time-on-issues-902499028.html