HOTSPOT
An administrator needs to shut down an AHV cluster to relocate hardware. The administrator upgrades NCC and runs health checks.
Which steps should the administrator perform next?
Item instructions: For each procedure, indicate the order in which that procedure must take place to meet the item requirements.
Answer:
Explanation:
Reference:
https://next.nutanix.com/how-it-works-22/scheduled-power-outage-relocating-cluster-hardware-if-youneed-to-shut-down-all-the-nodes-in-your-ahv-cluster-here-s-how-37326