Which steps must the integrator perform in the configuration to meet the customer’s needs?

Posted by: Pdfprep Category: HPE0-S58 Tags: , ,

A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPE Synergy platform.

Which steps must the integrator perform in the configuration to meet the customer’s needs?
A . Connect Satellite modules using Ports L1 and L4
B . Connect Ports Q7 and Q8 on the Master interconnect Modules (ICM)
C . Install Redundant Frame Link Modules and a second management ring
D . Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules

Answer: A

Leave a Reply

Your email address will not be published.