Posted by: Pdfprep
Post Date: February 10, 2021
HOTSPOT
Async DR is configured between two sites. A network outage occurs at the primary site.
Which steps must the administrator perform to bring the VMs back into service at the backup site?
Item instructions: For each procedure, indicate the order in which that procedure must take place to meet the item requirements. Not all procedures are valid. Identify any invalid procedures using the drop-down option.
Answer:
Leave a Reply