An administrator needs to power down an AHV node in order to replace a failed DIMM?
Which step should the administrator take after placing the node into maintenance mode?
A . Execute the command cluster status
B . Power of the node
C . Shut Down the nutanix CVM
D . Reboot the Nutanix CVM
Answer: C