Which step is more when the the single board replacement operation of main control board single configuration than main control board double configuration?
A . Download the original configuration data
B . Ensure that the version of the host software is the same before and after the replacement.
C . Consistency check of network management and network element data.
D . Query the alarm of the board and confirm that the original alarm has been cleared.
Answer: A