Which statement is true in this scenario?

Posted by: Pdfprep Category: JN0-1101 Tags: , ,

You are performing a risk assessment for a network design.

Which statement is true in this scenario?
A . Some risks can be safely ignored.
B . The likelihood of a risk occurring should not be considered.
C . A network must be designed for an uptime of five nines.
D . All identified risks must have a mitigation plan in place.

Answer: A