The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
A . Planning with make-to-stock (strategy 10)
B . Planning at the assembly level (strategy 70)
C . Planning without final assembly (strategy 50)
D . Planning with final assembly (strategy 40)
Answer: C