Which of the following will enable the customer to connect an HMC to the Power System E980?

A customer’s infrastructure is currently based on a Power System E870 managed by an HMC 7042-CR6 at V8.860 SW level. They planning to upgrade their server to a new Power System E980.

Which of the following will enable the customer to connect an HMC to the Power System E980?
A . Install vHMC on a partition on the Power System E980.
B . Order a new Power-based HMC (7063-CR1).
C . Upgrade the software on the existing HM
E . Use the existing HMC at the current SW level.