Which of the following steps is required for configuring SAP Landscape Transformation (SLT)?
A. Define the number of background work processes in SLT.
B. Define a DB connection from SLT to the source system.
C. Define the number of jobs to be used for data replication.
D. Define an RFC connection from SLT to SAP HANA.
Answer: C