Posted by: Pdfprep
Post Date: December 2, 2020
A customer has several workloads using virtual machines. The customer desires that the maximum number of active cores be made available for each workload, a shared SAN connection, and dedicated LAN throughput for each workload.
Which of the following satisfies the workload requirements?
A . Shared Processor Pool for the cores, NPIV for SAN, and dedicated LAN adapters
B . Shared Processor Pool for the cores and shared SAN and LAN adapters using a VIOS
C . Shared Processor Pool and dedicated SAN and LAN adapters
D . Shared Processor and SAN and LAN pools
Answer: A
Leave a Reply