Evaluate the status of the project against the defined exit criteria.
Which of the following options shows the correct status? 2 credits
A . Criteria A = OK, criteria B = OK, criteria C = OK
B . Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK
C . Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK
D . Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK
Answer: B