Posted by: Pdfprep
Post Date: January 5, 2021
Which of the following is the purpose of a risk register?
A . To define the level or risk using probability and likelihood
B . To register the risk with the required regulatory agencies
C . To identify the risk, the risk owner, and the risk measures
D . To formally log the type of risk mitigation strategy the organization is using
Answer: C