A server with redundant power supplies connected to two different UPS units fails to gracefully shut down during a power outage. A technician has verified cables and both UPS units are properly connected.
Which of the following hardware tools should the technician use to further troubleshoot this issue?
A . Load tester
B . OTDR
C . Loopback plug
D . Crimper
Answer: A