There are several techniques that can be used when planning a project.
Which of the following best describes a Work Breakdown Structure?
A . A technique which can be used with critical path analysis to deal with uncertainties and risk within the project.
B . A set of documents identifying each stage and task to be performed during development, defining a hierarchy of work prior to the allocation of tasks.
C . A method of scheduling tasks using a chart on which bars represents the relative length of the task.
D . A technique to arrange activities required to achieve the project objective, agreeing the objectives and determining exactly the project aims.
Answer: B