Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
A . MPS items are planned in a standard MRP run.
B . The planning of MPS and non-MPS items is always carried out in one planning run.
C . Non-MPS items can be taken into consideration by an MPS run.
D . MPS items can be defined on plant level.
E . MPS items can be defined on MRP area level.
Answer: C,D,E