Which is the last step in the hardware installation portion of an EMC Avamar multinode deployment?
A . Connecting to the customer network
B . Cabling the nodes to the switch
C . Powering on the nodes
D . Placing nodes in the rack
Answer: A
Which is the last step in the hardware installation portion of an EMC Avamar multinode deployment?
A . Connecting to the customer network
B . Cabling the nodes to the switch
C . Powering on the nodes
D . Placing nodes in the rack
Answer: A