Posted by: Pdfprep
Post Date: March 27, 2021
DRAG DROP
A company is designing a new bicycle by using a dimension-based Bill of materials (BOM).
The configuration groups have been defined and created.
You need to set up a BOM for the new bicycle.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Leave a Reply