Posted by: Pdfprep
Post Date: December 18, 2020
A product’s scope and acceptance criteria have been defined, and the product is planned for release at the end of the next quarter.
What should the project team do next?
A . Estimate the project team’s capacity.
B . Determine how much work can be delivered.
C . Calculate how much work will fit into the next iteration.
D . Estimate items in the product backlog.
Answer: A
Leave a Reply