Posted by: Pdfprep
Post Date: December 15, 2020
Refer to the exhibits.
Exhibit 1
Exhibit 2
A network administrator adds a new Mobility Controller (MC) to the production Mobility Master (MM) and deploys APs that start broadcasting the employees SSID in the West wing of the building. Suddenly, the employed report client disconnects.
When accessing the MM the network administrator notices that the MC is unreachable, then proceeds to access the MC’s console and obtains the outputs shown in the exhibits.
What should the network administrator do next to solve the current problem?
A . Decommission the MC from the MM, and add it again.
B . Open a TAC case, and send the output of tar crash.
C . Verify the license pools in the M
E . Kill two zombie processes, then reboot the M
Answer: D
Leave a Reply