Refer to the exhibit.
Partial configuration from N9K-1 and N9K-2 is included.
The client has two WANs connected.
– WAN-1 is for normal business-day activities.
– WAN-2 is for server backups during nonworking hours of 1:00 a.m. to 5:00 a.m. daily.
The client says that at the scheduled time for backup, the data center server failed to use the WAN-2 link to back up the servers to the cloud backup system.
What is the solution to this problem?
A . The event timer must be written in epoch time format.
B . The Cisco Nexus switch must be configured with one applet because a configuration with two applets will fail.
C . The Cron entry must be configured without double quotes.
D . The applet called “Backup” must include an action to remove the current static route.
Answer: D
Leave a Reply