Posted by: Pdfprep
Post Date: December 24, 2020
A company wants to receive rotating items that require inspection.
What is the order of tasks necessary to do this?
A . Receive Rotating Items, Change Inspection Status, Assign Asset number
B . Change Inspection Status, Receive Rotating Items, Assign Asset number
C . Change Inspection Status, Assign Asset number, Receive Rotating items
D . Receive Rotating Items, Assign Asset number, Change Inspection Status
Answer: D
Explanation:
Reference: https://www.ibm.com/support/knowledgecenter/SSLKT6_7.6.0.9/com.ibm.mbs.doc/receipts/ t_receive_material_rotate.html
Leave a Reply