Refer to the exhibit.
A network administrator assumes a task to complete the connectivity between PC A and the File Server Switch A and Switch B have been partially configured with VLANs 10, 11, 12, and 13.
What is the next step in the configuration?
A . Add PDA to VLAN 10 and the File Server to VLAN 11 for VLAN segmentation
B . Add VLAN 13 to the trunk links on Switch A and Switch B for VLAN propagation
C . Add a router on a stick between Switch A and Switch B allowing for Inter VLAN routing
D . Add PC A to the same subnet as the File Server allowing for intra-VLAN communication
Answer: B