A financial institution contacts an Aruba partner to deploy an advanced and secure Mobility Master (MM)-Mobility Controller (MC) WLAN solution in its main campus and 14 small offices/home offices (SOHOs). Key requirements are that users at all locations, including telecommuters with VIA, should be assigned roles with policies that filter undesired traffic. Also, advanced WIPs should be enforced at the campus only.
These are additional requirements for this deployment:
RAPs should ship directly to their final destinations without any pre-setup and should come up with the right configuration as soon as they get Internet access.
Activate should be configured with devices MACs, serial numbers, and provisioning rules that redirect them to the standalone VMC at the DMZ
Users should be able to reach DNS, FTP, Web and telephone servers in the campus as well as send and receive IP telephone calls to and from the voice 10.1.50.0/24 segment.
Local Internet access should be granted.
Refer to the exhibit.
Refer to the scenario and the exhibit.
What is the minimal license capacity in use to support this proposal?
A)
B)
C)
D)
A . Option A
B . Option B
C . Option C
D . Option D
Answer: D