A customer has a 2-frame disk-only IBM TS7760 and is running out of capacity. There is a requirement to store an additional 2.4 PB of compliance data in the near future.
What is the lowest cost option to accommodate this new data?
A . Add a second IBM TS7760 subsystem to accommodate 2.4 PB of data.
B . Implement Copy Export to migrate compliance data from IBM TS7760 to tape.
C . Add tape attach feature, a minimally configured IBM TS4500 library, and media.
D . Add IBM Spectrum Archive to work with the IBM TS7760.
Answer: B