What does it mean if an SSCUI has a "Yes" in the "Redo in P System" column?
A . You must manually redo the configuration in the production system, because it is not captured in change projects.
B . SSCUI records are specific to a company or country and every country has its own unique configuration records.
C . The configuration is transferred from the quality system to the production system in change projects.
D . The configuration records are the same for all countries and all country solutions have the same data.
Answer: A