What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)
A . ATP checks can be carried out automatically when releasing a production order.
B . ATP checks are automatically performed during Material Requirements Planning (MRP) runs.
C . ATP checks are used to evaluate the free capacity on a certain work center.
D . ATP checks are mandatory for lead-time scheduling.
E . ATP checks can be adjusted to also consider future requirements and receipts.
Answer: A,E