When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three.)
A . General values from work scheduling view in the material master
B . Standard value from operation in task list
C . User-defined field from operation in task list
D . General operation values in task list
E . General item values in bill of materials
Answer: B,C,D