Posted by: Pdfprep
Post Date: November 18, 2020
Upon arrival of coating materials, the inspector should
A . review coating contractors’ plans for storage of coating materials and confirm they meet national, local and owners’ fire and environmental regulations.
B . observe and document the amount of material and batch numbers.
C . observe aryl document that the applicator WFT at regular intervals during application.
D . observe and document time frame and environmental conditions between each coat.
Answer: B
Leave a Reply