OSN6800 single master NE master failure, what operations need to be performed after replacing the master? (Multiple choice)

OSN6800 single master NE master failure, what operations need to be performed after replacing the master? (Multiple choice)
A . Back up the NE database before loading
B . Activate the database and send it to the board
C . Network management download data
D . Modify the network element IP/ID to be the same as the original network element

Answer: ABD