OSN6800 single master NE master failure, what operations need to be performed after replacing the master? (Multiple choice)

Posted by: Pdfprep Category: H12-931-ENU Tags: , ,

OSN6800 single master NE master failure, what operations need to be performed after replacing the master? (Multiple choice)
A . Back up the NE database before loading
B . Activate the database and send it to the board
C . Network management download data
D . Modify the network element IP/ID to be the same as the original network element

Answer: ABD

Leave a Reply

Your email address will not be published.