Posted by: Pdfprep
Post Date: May 4, 2021
You have a 4-node MetroCluster system. A node needs to be taken down for maintenance, but all data needs to remain online.
In this scenario, what should you do to bring down a single node?
A . Perform an HA takeover of the node.
B . Perform a MetroCluster switchover.
C . Disable HA on each side of the MetroCluster.
D . Perform an aggregate relocation of the CFO aggregates on the node.
Answer: A