PdfPrep.com

In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?

Exhibit:

In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?
A . Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run service drop to each boat slip.
B . Provide one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
C . Pre-cable each boat slip during construction.
D . For security, each run should be terminated in the patch panel/ cross-connect at the dockmaster or marina office.

Answer: A

Exit mobile version