In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?

Exhibit:

In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?
A . Installed one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
B . Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Install service drop to each boat slip.
C . Pre-cable each boat slip during construction.
D . For security, each install should be terminated in the patch panel/cross-connect at the dockmaster or marina office.

Answer: A