In scheduling a conference in the SMC, if the “master MCU” selects “automatic”, the SMC will
The conference is scheduled on the MCU in the service area. ()
A . TRUE
B . FALSE
Answer: A
In scheduling a conference in the SMC, if the “master MCU” selects “automatic”, the SMC will
The conference is scheduled on the MCU in the service area. ()
A . TRUE
B . FALSE
Answer: A