Identify the missing words in the following sentence… A PRINCE2 project is and controlled on a stage-by-stage basis?

Identify the missing words in the following sentence… A PRINCE2 project is and controlled on a stage-by-stage basis?
A . Planned, monitored
B . Developed, reported
C . Designed, assigned
D . Planned, produced

Answer: A