Posted by: Pdfprep
Post Date: December 15, 2020
You are backing up a group of clients that have varying schedules. Using the EMC NetWorker Administration interface, you need to perform a full backup of all clients in that group.
How would you ensure that a full backup is performed for a client when it is backed up during the next save group execution?
A . Set an override level in the backup schedules to Full in the next date
B . Change the group level to Override
C . Uncheck the Force incremental option in the group resource Advanced tab.
D . Create a staging resource called full and set the destination pool to full.
Answer: A
Leave a Reply