You are required by architectural design to place UTP cables in the same space as unshielded power lines.
How should you proceed with the placement of your cables?
A . Require the architect/electrical engineer to place shielding in the space before your UTP is placed.
B . You should provide a minimum separation of 610 mm (24 in).
C . You should provide a minimum separation of 229 mm (9 in).
D . You should provide a minimum of two 101 mm (4 in) RM
Answer: B