Posted by: Pdfprep
Post Date: December 21, 2020
An agile team has been given a complex project with a basic set of requirements which need further elaboration and review.
How should the team iteratively build out the backlog of requirements with the stakeholders?
A . Conduct a requirements gathering workshop.
B . Deliver the basic requirements iteratively.
C . Have the product owner fill out the requirements backlog.
D . Have the stakeholders fill out the backlog before starting the project.
Answer: A
Leave a Reply