How should Product Backlog items be chosen when multiple Scrum Teams work from the same Product Backlog?
A . The Scrum Team with the highest velocity pulls Product Backlog items first.
B . The Development Teams pull in work in agreement with the Product Owner.
C . The Product Owner should provide each team with its own Product Backlog.
D . Each Scrum Team takes an equal numbers of items.
E . The Product Owner decides.
Answer: B