Fora typical inspection program, if excessive inspectionis applied then,
A . Level of risk may go up
B . Level of risk may go down
C . Level of risk remain the same
Answer: A
Fora typical inspection program, if excessive inspectionis applied then,
A . Level of risk may go up
B . Level of risk may go down
C . Level of risk remain the same