For a stakeholder with low interest and high power, the project manager should:

For a stakeholder with low interest and high power, the project manager should:
A .  Monitor the stakeholder.
B .  Manage the stakeholder closely.
C .  Keep the stakeholder satisfied.
D .  Keep the stakeholder informed.

Answer: C