-25%
$59.99
Save 25% with Coupon Code "pdfprep"
SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing
Premium Q&As: 148
Version: PDF
Last update: September 10, 2023
Last Week Results!
Related C_TS422_2020 Questions & Answers
- What does it mean for the production planner when MRP works with infinite capacities?
- How can you switch off the phantom assembly in a specific bill of material (BOM)?
- What is the difference between co-products and by-products?
- What determines whether the planned independent requirements in MRP consume other requirements?
- When do you use variant bills of materials (BOMB)?
- What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- What does the industry sector determine? Note: There are 2 correct answers to this question.
- How does the insertion take place?
- Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.
- Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?
- What determines whether the storage location can be derived from the production version?
- Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
Reviews
There are no reviews yet.