PdfPrep.com

Based on the output shown in the exhibit, which statement is correct?

Click the Exhibit button.

Based on the output shown in the exhibit, which statement is correct?
A . The ge-0/0/9 interface is using the default interface priority value.
B . This switch has a bridge priority of 8k.
C . This switch is currently blocking all traffic.
D . The ge-0/0/15 interface is using the default port cost.

Answer: B

Exit mobile version