Posted by: Pdfprep
Post Date: November 7, 2020
A technician has installed an additional CPU into a server, but now the server is failing to pass POST.
After verifying the CPU speed and multiplier, which of the following does the technician need to check for potential causes?
A . ECC
B . CAS
C . Stepping
D . Bus size
Answer: C
Leave a Reply