Posted by: Pdfprep
Post Date: May 19, 2021
A deficient control has been identified which could result in great harm to an organization should a low frequency threat event occur.
When communicating the associated risk to senior management, the risk practitioner should explain:
A . the current level of risk is within tolerance.
B . mitigation plans for threat events should be prepared in the current planning period.
C . an increase in threat events could cause a loss sooner than anticipated.
D . this risk scenario is equivalent to more frequent, but lower impact risk scenarios.
Answer: C
Leave a Reply